ARIANZ-SUNWOOD

In 2016 arianz sunwood mataram were expands their facility of hospitality, the option for final structural design was to develop new seven storey building besides the previous one. This final option were taken according to result from exisiting building structural investigation.

The final structural design of new building were placed in 20mm gap to previous building. With that gap, architect & interior designer were developed integrated façade to deliver a new fresh look for the hotel.